Tank and Line Replacement
- Remove and replace existing underground tanks (1 new, 100,000L Regular and 1 new 65,000L split (40L diesel and 25L premium)), backfill for tanks, piping and new concrete
- Remove and reinstall 1.5” diameter underground petroleum piping and electrical
- Replace 2 Dispensers, re-use 2 Dispensers
- Supply and install new vent rack, 2hp & 1.5hp STP’s, tank level probes and associated petroleum equipment
- Form, place, pour and finish new tank pad, apron and islands
- New asphalt where required, replace landscaping where disturbed for electrical conduit trenching
- New light pole on vacuum island to be installed
- New INCON monitoring system c/w tank probes, sump sensors and ELLD
- Relocate intercoms from columns to dispensers, supply and install new fire extinguishers
Building Exterior
- Paint existing building white w/red band
- Scrape and paint underside of Canopy
- New MID signage upgrades and LED canopy lighting